As solar and wind energy capacity expands, it is becoming increasingly important to store electricity when more is being generated than consumed, and to make it available again when needed. Battery storage systems play a key role in ensuring a flexible and stable energy system.

Alpiq is therefore planning to build one of Switzerland’s most powerful battery storage system in the Grossacker area of Niedergösgen (canton of Solothurn). The facility, with a capacity of 300 megawatts (MW) and a storage capacity of more than 1.2 gigawatt-hours (GWh), is being built between the Alpiq Gösgen run-of-river power plant and the Alte Aare. When fully charged, it can store enough electricity to meet the consumption of around 500,000 households for more than four hours.

Thanks to its proximity to the existing energy infrastructure and to a key hub in the Swiss transmission grid, Niedergösgen offers excellent conditions for a battery storage project of this scale. The storage facility provides additional flexibility for the electricity system, supports the integration of renewable energies and thus contributes to a secure and reliable electricity supply.

Visual Niedergösgen

BESS Niedergösgen Visual

BESS Niedergösgen Timtetable

BESS Niedergösgen Timtetable

One of Switzerland’s most powerful battery storage facilities is planned in Grossacker

Capacity

300 MW

Storage capacity

1.2 GWh

Households

Able to meet the electricity needs of around 500,000 households for more than four hours

Groups

72 groups, each comprising 4 battery containers approximately 3 metres high