Choose a country to see content and products for this location.
Country or territory
Available languages
OKThe Striempel small hydropower station in the municipality of Langnau am Albis in the canton of Zurich generates electricity using the water that feeds the drinking water reservoir. In 2009, the power station was financed by Entegra Wasserkraft AG in return for the rights of use. The company has been operating the power station ever since.
Plant Type: | Drinking water power plant |
Location: | Langnau a. Albis, Switzerland |
Number of turbines: | 1 Pelton, vertical axis, Sigrist AG |
Capacity: | 14 kW (0.014 MW) |
Shareholding via Entegra: | 100 % |
Commissioning: | 2010 |
Average annual production: | 0.046 GWh |
Guided tours: | No |
Status: | In service |