OKThe idea for the construction of a small hydropower plant was conceived in 2007 in collaboration with the municipality of Peist (Swiss canton of Grisons) and Arosa Energie. The investment amounted to approximately CHF 2.7 million. The ground breaking took place on 7 April 2017.
Plant type: | Small-scale hydropower plant |
Location: | Arosa, Switzerland |
Number of turbines: | 1 Pelton, vertical axis, Troyer |
Capacity: | 0.295 MW |
Shareholding via Entegra: | 51 % |
Commissioning: | Q3/2018 |
Average annual production: | 1.2 GWh |
Guided tours: | No |
Status: | In service |