Contact form

Contact Form (Conditions: Gas, electricity, phone)

Contactdata/ General interest (Contact-Flap)
What is your interest?
Product-Section (Contact-Flap)
Gas supply informations (Contact Flap Options)
Your annual consumption
Your sites
Electrcity supply informations (Contact Flap Options)
Your annual electricity consumption
Your sites
Submit (Contact-Flap)

Moos small-scale hydropower plant

The Moos hydroelectric power plant, constructed in 1945 and refurbished in 1998, generates electricity that covers the consumption of more than 1,300 households. It is located on the River Birs, upstream from the village of Grellingen in canton Basel-Land. The Kaplan turbine with a diameter of 165 cm has a maximum output of 880 kW.

Facts & figures

Plant type:

Small-scale hydropower plant

Location:

Grellingen, Switzerland

Number of turbines:

1 Kaplan, vertical axis, Escher Wyss

Capacity:

0.88 MW

Shareholding:

100 %

Commissioning:

1945, last refurbishment 1998

Average annual production:

5.74 GWh

Guided tours:

No

Status:

In service