EN |DE |FR |IT
  • Home
  • Contact

    Group Contacts

    Operational Headquarters

    Alpiq Holding AG

    Bahnhofquai 12

    4601 Olten

    Switzerland

    T: +41 62 286 71 11

    F: +41 62 286 73 73

    info@­alpiq.­com

    www.alpiq.com

    Energy International

    Reinhold Frank

    Alpiq Holding Ltd.

    Head of Energy International

    T: +41 62 286 74 66

    F: +41 62 286 71 30

    Energy Switzerland

    Michael Wider

    Alpiq Suisse SA

    Head of Energy Switzerland

    Ch. de Mornex 10 / CP 570

    1001 Lausanne

    Switzerland

    T: +41 21 341 21 11

    info.­lausanne@­alpiq.­com

    Optimisation & Trading

    Erik Saether

    Alpiq Trading AG

    Head of Optimisation & Trading a.i.

    Bahnhofquai 12

    4601 Olten

    Switzerland

    T: +41 62 286 71 11

    info.­trading@­alpiq.­com


  • Sitemap
  • Login
Alpiq in: Europe

Nufenen

380-kV Nufenen Pass line

In autumn 2005 the new 380-kV high-voltage power line over the Nufenen Pass went onstream. Construction workers erected a total of 42 lattice masts along the 14-kilometer route between Ulrichen in the Upper Valais and All'Acqua in the Bedretto Valley at altitudes of between 1350 and 2450 meters asl. The cost is around CHF 34 million.

The new power line increases the security of supply in Switzerland and improves the transportation of electricity generated by alpine hydroelectric power stations. A new link has also been provided for railway operations, to ensure the smooth running of trains through the new alpine transversal tunnels. The section over the Nufenen Pass between Ulrichen and All'Acqua is part of a project to fully renovate the high-voltage line between Chamoson (VS) and Lavorgo (TI) with the aim of setting up a 380-kV through-link. The construction work is jointly financed by eight companies: Alpiq, BKW, EOS, FMV, KW Aegina, Lonza, NOK and the Swiss Federal Railways (SBB).

380 kV

Switzerland

Nufenen, Switzerland

14 km

Alpiq owned