EN |DE |FR |IT
  • Home
  • Contact

    Group Contacts

    Operational Headquarters

    Alpiq Holding AG

    Bahnhofquai 12

    4601 Olten

    Switzerland

    Phone: +41 62 286 71 11

    Fax: +41 62 286 73 73

    info@­alpiq.­com

    www.alpiq.com

    Energy Central Europe

    Reinhold Frank

    Alpiq Holding Ltd.

    Head of Energy Central Europe

    Phone: +41 62 286 74 66

    Fax: +41 62 286 71 30

    Energy Western Europe

    Antonio M. Taormina

    Alpiq Holding Ltd.

    Head of Energy Western Europe

    Phone: +41 62 286 75 59

    Fax: +41 62 286 76 68

    Energy Switzerland

    Michael Wider

    Alpiq Suisse SA

    Head of Energy Switzerland

    Ch. de Mornex 10 / CP 570

    1001 Lausanne

    Switzerland

    Phone: +41 21 341 21 11

    info.­lausanne@­alpiq.­com


    Trading & Services

    Peter Heydecker

    Alpiq Suisse SA

    Head of Trading & Services

    Ch. de Mornex 10 / CP 570

    1001 Lausanne

    Switzerland

    Phone: +41 21 341 28 11

    Energy Services and AAT Group

    Herbert Niklaus

    Alpiq Holding Ltd.

    Head of Energy Services and AAT Group

    Phone: +41 62 286 70 08

    Fax: +41 62 286 75 55

  • Sitemap
  • Login
Alpiq in: Europe

Power Grid Projects

Transit axes free from congestion risk

Alpiq is continually expanding Switzerland's largest transmission grid with a view to increasing the country's energy security. To avoid any congestion on our "electricity highways", both now and in the future.

Story: 28.05.2009

220-kV line section between Mettlen and Plattischachen

220-kV line section between Mettlen and Plattischachen

Between February and June 2009 Atel Transmission Ltd. is installing four new masts along the 220-kV Mettlen – Plattischachen line. The aim of the joint project with the Swiss Federal Railways (SBB) in the canton of Uri was to improve protection against flooding by the River Reuss. Combining the two line sections of Atel and SBB and rerouting the ...

Story: 06.03.2009

380-kV line between Chamoson and Chippis

Chamoson-Chippis

The permit procedure for the two-strand high-voltage line between Chamoson and Creux de Chippis is progressing well. The dossier is now in the hands of the Federal Office of Energy, which will decide on the definitive line route.

Story: 26.05.2008

Installing the 380-kV Yverdon-Galmiz line

380-kV-Leitung

Designed as an artery for expansion of the major Swiss and European high-voltage grids, the Yverdon-Galmiz transmission line will help to ensure energy security in Western Switzerland through its link with the Romanel-Verbois section already in place. The first permit procedure was launched back in 1976, and the project is still attracting keen ...

Story: 20.08.2008

Connecting the world's largest offshore wind farm to the grid

Alpiq: Connecting the world's largest offshore wind farm to the grid

The world's largest off-shore wind farm is currently being constructed in the North Sea off the coast of Germany. GA Energieanlagenbau Nord GmbH, a subsidiary of the AAT Group Heidelberg, has been commissioned to build the high-voltage grid connection route.